
Shower Waterproofing in Bristol, CT
Bonded, flood-tested shower waterproofing in Bristol: behind fiberglass cut-outs in the ranches and raised ranches, in Federal Hill's plaster-walled bathrooms, and in the city's two-to-four-family rentals.
Shower waterproofing in Bristol
About 16.2% of Bristol's housing is from 1939 or earlier, and where the room is opened for waterproofing the floor below it is usually from that era.
Bristol's soil map shows 285 units in hydrologic group B and 213 in group A, and where a shower pan is dug out the soil sets the base.
January at the nearest station averages 27.1 degrees, and where a shower sits on a cold slab the waterproofing is usually detailed before the tile is set.
Bristol's Federal Hill Historic District carries a 1986 National Register listing, so a shower in that row usually meets an older wall.
Where a Bristol shower is stripped for waterproofing, the permit goes to the building department, and the fee schedule is posted online.
Waterproofing in Bristol is about 16 minutes from our base, and the quote for a Bristol shower usually covers the pan and the floor below it.
Recent Work
Waterproofing photos from our jobs



All photos are from Dmtilellc installations. See the full gallery
Google Reviews
What Bristol Homeowners Say
Marek Pawulski
November 2026
Daniel did some tile work for me and I couldn’t be happier with how everything turned out. Absolutely amazing work and craftsmanship. He showed up on time, was very professional throughout the whole job, and did a fantastic job. You can tell he takes pride in his work and pays attention to the little details. Good, reliable contractors aren’t always easy to find, and Daniel is definitely one of them. The quality of the work was excellent, everything was done right, and he was worth every penny. I will definitely use him again and wouldn’t hesitate to recommend him to anyone looking for quality tile work. Highly recommend! Daniel, thank you so much for getting the job done on short notice.
Response from the owner
Thank you so much for taking the time to share such a detailed review! It was a pleasure working with you, and I truly appreciate your kind words and trust. I’m glad you’re happy with the finished work and that I could get everything done on short notice. I look forward to working with you again!
Anne Hope
November 2026
Daniel does amazing work, Very professional, and great prices! I would highly recommend Daniel to anyone that is seeking great work and a great price!
Response from the owner
Thank you so much for the kind words and recommendation! We truly appreciate your support and are glad you were happy with our work, professionalism, and pricing!
Autumn
November 2026
Rated 5 stars, no written review.
Waterproofing · Bristol
Bristol showers: the substrate is where the job is won or lost
Behind Bristol's showers you find four different substrates, because the town was built in layers, with 39% of the housing predating 1960 on top of a pre-war core: mortar beds over tar paper in Federal Hill and Forestville's older homes; mastic-set tile on greenboard in the 1960s and 70s ranches; one-piece fiberglass units nailed to studs in the raised ranches and split-levels; and 1980s tub decks and mud pans in the Edgewood colonials. None of them has a bonded membrane. That is the layer we add.
Our approach does not change with the house: the wet area comes out to the studs and subfloor, the framing is dried, repaired and furred flat, a pre-sloped pan is bonded to a new drain flange, a membrane goes over walls and floor with sealed seams and penetrations, and the pan is flood-tested for twenty-four hours before tile. In the town's many two-family rentals we add a membrane over the whole bathroom floor. Bristol is sixteen minutes from our base.
Not sure how much of this your home needs? Start here: the five layers behind a shower that lasts It takes five minutes and saves guessing.
In Bristol we waterproof every shower with a bonded system: Schluter-KERDI membrane, pre-sloped pans, curbs and a flood test before a single tile goes down.
Bristol Housing at a Glance
Hartford County
- Homes
- 26,369
- Median year built
- 1967
- Built before 1960
- 39%
- Built 1980 or later
- 31%
- Single-family detached
- 55%
- In 2-4 unit buildings
- 19%
- In 5+ unit buildings
- 20%
- Owner-occupied
- 65%
- From our base
- ≈16 min
Source: U.S. Census Bureau, ACS 2020-2024 5-year estimates. ZIP codes 06010, 06011.
What we check before quoting a Bristol shower
Behind the fiberglass
Removing a one-piece unit usually reveals damaged drywall at the tub line and a 1½-inch drain. Both are replaced; the shower drain becomes 2-inch and the walls become cement board with a bonded membrane.
Split-level access
In raised ranches the shower is often over a finished lower level; we confirm whether the drain can be reached from below so the plumber's rough-in and the flood test do not require opening a finished ceiling.
Rentals and turnover
For a two-family we recommend the whole-floor membrane, epoxy grout, and a schedule that puts the plumber's inspection and the flood test back to back so the unit is out of service the shortest time.
Permits in Bristol
Does this work need a permit?
Under the 2022 Connecticut State Building Code (§R105.2), tiling, cabinets, countertops and similar finish work that involves no structural change is exempt from a building permit. Plumbing changes such as a new valve or a moved drain, and any electrical work, are permitted separately by the licensed plumber or electrician who performs them. We tell you which items in your scope apply before work starts.
Where permits are filed
Hartford County
City of Bristol, Building Department
111 North Main Street, Bristol, CT 06010
Tel. 860-584-6215
Permit applications and permit searches are handled online through the city's portal; the department also posts its fee schedule.
Official Bristol building department pageFrequently Asked Questions
Shower Waterproofing in Bristol: Questions
No. Daniel and his own crew do the tile work. We do not hand your job to a third-party installer, so the same people who set the tile are the ones in your house every day of the install, and you deal with one company from the estimate through the final clean-up.
A sloped pan (pre-formed foam or a hand-built mortar pre-slope) bonded to a drain with a bonding flange; cement board or foam board on the walls; a bonded sheet or liquid membrane over both, with sealed inside and outside corners, seams and pipe penetrations; a curb wrapped in membrane; a 24-hour flood test; and only then thin-set and tile. The tile is the finish, not the waterproofing.
Both work when installed to the manufacturer's instructions. We are Schluter-trained and use KERDI sheet systems in most showers; liquid-applied membranes suit some irregular geometries and repairs. What matters more is continuity: one unbroken waterproof layer from the drain flange to the top of the wet wall, and a 24-hour flood test that checks the pan.
For a fiberglass-to-tile conversion in a ranch, plan on about seven working days on site: demo and framing repair, the plumber's rough-in and inspection, board and membrane, a 24-hour flood test, two to three days of tile, then grout and silicone. Silicone cures overnight before first use.
Waterproofing and tile are exempt from a building permit under the state code. Changing the drain size or the valve is a plumbing permit and new wiring is an electrical permit, both filed online with the Bristol Building Department at 111 North Main Street by the licensed trade doing that work.
We build the pan, then go over it with a bonded waterproofing membrane such as a Schluter-KERDI style sheet or a liquid-applied one where the geometry calls for it. The membrane runs over the pan, up the walls, around the curb, and over every seam, corner and valve penetration, and we hold a twenty-four-hour flood test before any tile goes down. If a drop moves, we find it while it is still inexpensive to fix.
Only sometimes, and only when the old tile passes the checks: solidly bonded everywhere when you tap it, flat, and structurally sound, with enough give at the outlets, counters and doors to absorb the added thickness. When it fails any of those, tiling over it locks the problem in. On a wet area we almost always take it down to the substrate instead.
Still have questions? Call us at (860) 990-2332
Guides
Waterproofing Questions, Answered
The questions homeowners ask us before the estimate. Read them before you book anyone, then call us with your questions.
Showers
What Goes Behind Shower Tile, and Why It Decides Whether the Shower Lasts
The pan, the membrane, the backer board, the grout and the tile. Five layers, and the one nobody sees is the one that decides how long the shower lasts.
Technical
Preparing a Subfloor for Tile
What a subfloor has to be before tile goes on, the common failures, and the tile problems that no amount of good tile can fix.
Permits
Do I Need a Permit for a Bathroom Remodel in Connecticut?
What the state code exempts, what needs a trade permit, and why a tile job and a plumbing job are not the same job. Read this before you pull anything off a wall.
How we work
Our Tile Installation Process, Step by Step
The whole sequence, from the first visit to the last silicone joint. Substrate prep, waterproofing, layout, setting, grout. No steps skipped.
More Tile Services in Bristol
The same careful work, for every surface in your Bristol home.
Waterproofing in Nearby Towns
Local crews, same standard, across Connecticut.

Shower Waterproofing in Bristol? Get Your Free Estimate.
If you are in New Britain, Berlin, Newington, Plainville, Farmington, Avon or a nearby Connecticut town and need tile installation, bathroom remodeling, shower waterproofing, backsplash work, or floor tile installation, contact Dmtilellc today. Free estimates available.