What Actually Drives the Cost of a Bathroom Remodel

Nobody gets a straight number out of a contractor who has not seen your bathroom, and anybody who gives you one before opening it is guessing. Here are the seven things that move the number, what to ask about each one, and what happens if the scope grows once the wall is open.

The Short Answer

The Number Comes From Opening the House

A bathroom remodel is the one job where the estimate and the bill can be far apart, and the reason is not anybody cutting corners. It is that the job is defined by things you cannot see until the old tile is off the wall.

So instead of a number on a website, here is the list of what moves it. Read it, take it to your estimates, and use it to compare the people you are talking to. Every contractor you call has their own opinion about these seven things, and the difference between their quotes is usually one or two of them.

The Seven

The Seven Things That Move the Number

  1. The layout. Where the toilet, the tub and the sink are, and whether that changes.
  2. The plumbing. How much drain and supply work is needed, and what the old piping is made of.
  3. The substrate. What is under the old floor, and whether it can carry a new one.
  4. The tile size. Small format and large format are two very different jobs to install.
  5. The removal. What comes off, what has to be chipped, and what leaves the house.
  6. The wall height. How far the tile goes up, which changes the area and the waterproofing.
  7. The finishes. Grout, trim, niches, benches, drains and the tile the rest of the room has to match.

One and Two

The Layout and the Plumbing Do Most of the Work

Which Fixtures Stay, and What Moving One Really Costs

A fixture that stays where it is stays cheap. A fixture that moves brings new drain, new supply, new venting and often new framing with it. That is why the first question on most bathroom remodel estimates is not about tile. It is about whether the toilet can stay where it is.

Moving a toilet to another wall means running a new drain to a different part of the stack and finding a vent for it. Moving a tub means new plumbing at both ends. Widening a door to make the room feel bigger means new framing and a header, and it changes how the tile has to be cut around it.

The Condition of the Old Piping

Then there is the condition of the old piping. Many older Connecticut houses have galvanized steel or cast iron drain lines, and galvanized supply lines that have narrowed with scale over the years. That affects what a new shower or a new valve can be fed with. It is also trade work, done by a licensed plumber, with its own permit, and it is a separate line on the estimate rather than something folded into the tile number.

Ask Which Fixtures Stay and Who Pulls the Permit

The question to ask is simple. Ask which fixtures are staying, which are moving, and who is doing the plumbing and pulling the permit.

Three, Four and Five

The Substrate, the Tile Size, and the Removal

The Substrate Is What You Find When the Floor Comes Up

The substrate is what you find when the floor comes up. A soft patch, a rotten joist end, a subfloor that is too thin for tile, a slab that has been patched more than once. Any of those means building the floor back up before the tile can go on. A contractor who does not open the floor cannot price that, which is why a tile-only quote is often not the whole job.

Tile Size Changes the Labor More Than the Material

The tile size changes the labor more than people expect. Small format tile goes down quickly by area but takes a lot of cuts and a lot of grout. Large format tile, with an edge of 15 inches or more, goes down faster by area but needs a much flatter substrate, more layout planning, more cuts of good material and often a different adhesive. Big tile can cost more to install even when the tile itself is not more expensive. And in a small room, big tile means more waste, because a bad cut has nowhere to hide.

Removal Is the Part Homeowners Underestimate

The removal is the part homeowners underestimate. Old tile set in a mortar bed comes up in chunks and takes the bed with it. Tile over concrete means the slab may have to be chipped. And then everything has to leave the house. Demo is one of the least expensive parts of the job in money and one of the most disruptive in your week.

Six and Seven

The Wall Height and the Finishes

Wall Height Sets the Area and the Waterproofing

The wall height decides how much tile there is and how much waterproofing there is. A shower surround that stops at the usual height is one job. Tile to the ceiling in a shower is a lot more tile and a lot more wall, and the wall gets wet all the way up, so the membrane has to go higher too. In a half bath, wainscoting to a set height and tile all the way to the ceiling are two different rooms to price.

The Finishes Are Small Decisions That Add Up

The finishes are the decisions made at the end, and every one of them is a decision. Cement grout or epoxy. A trim or a bullnose on every exposed edge, or a simpler profile. A niche in the shower wall. A bench. A curb. A linear drain instead of a round one. Mosaic around the border. The countertop the tile has to meet. The silicone work at every change of plane. None of these are big on their own. Together they are a large part of the difference between two quotes.

Choose the Finishes After the Room Is Open

The mistake here is choosing the finishes before anyone knows what the space looks like empty. A layout that looks right with a vanity in it can leave a strange gap behind a shower with a niche in the wrong place. Decide the finishes once the room is open.

Before You Sign

Questions to Ask Any Bathroom Remodeler

  • Is this a fixed price or a range, and what is the difference between the two ends of it?
  • What is included and what is not? A tile estimate that leaves out the demo, the haul-away and the waterproofing is not a remodel estimate.
  • What happens when the scope grows once the wall is open? What is the process, and do I approve it in writing before the work starts?
  • Who does the plumbing, and who pulls the permit for it? We are a home improvement contractor registration, not a plumbing licence, so that work goes to a licensed plumber.
  • How is the substrate and the waterproofing handled, and how is it tested before the tile goes on?
  • What is the schedule, and what happens if a trade runs behind?

What to Do Next

Ask for a Written Scope, Then Have the Room Opened

When you compare estimates, compare them line by line on these seven points rather than on the total at the bottom. Two bids with different numbers can be the same job priced two ways, and the difference is usually scope rather than skill.

On our estimate we write down what is included, what is not, who is doing each part, and what has to be decided once the room is open. If the scope does grow, it gets priced before the work happens, and it goes on the estimate as a line you can see.

Frequently Asked Questions

Bathroom Remodel Cost - Questions

We do not publish a number, and the reason is not modesty. The number is decided when the wall is open. What moves it is on this page: the layout, the plumbing, the substrate, the tile size, the removal, the wall height and the finishes. A number given before anybody has seen the room is a guess, and a guess is the thing that goes wrong.

Not for one reason you can name. A primary bath usually has more square feet, so more floor and more wall, and it often has a tub and a separate shower instead of one combination. But the number of fixtures does not decide it. The layout, the plumbing and what is behind the wall decide it. A small bath with a new drain and a new wall can move more than a large one that gets a fresh coat of paint.

Often, yes, and it is the most direct way to hold the scope still. It depends on what is behind the old tile. If the shower pan and the substrate are sound, the tile can come off and new tile can go on. If the pan has failed, the wall has to come off too, and that changes the job.

Sometimes, and it is a reasonable question. Demo is one of the least expensive parts of the job in money and one of the most disruptive in your house. If you take it on, you need to know what to look for as it comes up and what to leave behind so we can work on it. We will tell you what the job involves either way.

It depends on the scope and on the trades. A retile onto a sound substrate is a short job. A rebuild with new plumbing is a longer one, and it is set by the plumber's schedule as much as by ours. Ask for a schedule with the estimate, and ask what happens if a trade runs behind.

Still have questions? Call us at (860) 990-2332

Where this work gets done

Bathroom tile remodeling, How long a bathroom remodel takes by Dmtilellc across Connecticut. Ask for a free estimate.

Want a Written Scope With the Number On It? Let's Open the Room.

If you are in New Britain, Berlin, Newington, Plainville, Farmington, Avon or a nearby Connecticut town and need tile installation, bathroom remodeling, shower waterproofing, backsplash work, or floor tile installation, contact Dmtilellc today. Free estimates available.